Par toth9443
28 novembre 2023
After 3 years of this company doing a 6 month addition, we were left with siding falling off our house, drywall splitting at seams everywhere, a roof that had to be reinforced to avoid it falling in on our children, live electrical buried behind walls, incorrectly installed plumbing, unlevel floors, miscalculated walls, unlevel kitchen cabinets, incorrect kitchen cabinets, unconnected HVAC, unfinished on-suite, and an unlevel lot full of pits and buried garbage.
>
Signaler
Vous êtes le proprio? Répondez ou Contactez PJ